Giving an outside team site access: passes, NDA and safety
When an outside crew enters a warehouse, rules are needed to protect goods and data. On passes, NDAs, personal belongings and camera coverage.
Eight or ten outsiders arrive at the warehouse: they walk the aisles, see the stock and sometimes prices and customer names. This is an ordinary part of the process, but their access should not be without rules. Rules matter for the safety of goods, for the confidentiality of data and for the team itself: when everyone knows what is allowed, there are fewer disputes. Below is what an access procedure can consist of.
Why rules are needed
Two things in a warehouse are valuable: the goods and the information about them. Stock quantities, costs, suppliers and what is stored where may be useful to a competitor. An outside team sees part of this information, so it must be protected by a written rule. That is not distrust of the contractor but an ordinary procedure that suits both sides. Typical cases without rules: someone not on the list walks in with the team, someone photographs the racks on a phone, and the guard does not know who belongs to which company.
Before entry: lists and passes
A day or two before work starts, do the following:
- The contractor supplies a written list of team members with names and roles.
- Your access service (guards, security) is given the list.
- On the day, each person receives a temporary pass against an identity document.
- Entry and exit times are recorded.
- Anyone not on the list is not admitted; if a replacement is needed, notice is given in advance.
Name and role are enough on the list. If you ask for further personal data, agree with a lawyer how it is stored and used.
The team enters only the zone being counted. If access is needed to a cash office, server room, document archive or an area of especially valuable goods, a separate permission and an escort are assigned.
The confidentiality agreement
A non-disclosure agreement (NDA) is usually signed before work begins. It should state clearly which information is confidential (stock, prices, customer lists, the warehouse layout), who may see it and where, whether copies are returned or deleted after the job, and how long the agreement lasts. Add a separate clause for photos and video: they are taken only for count documents and are not distributed for other purposes. A lawyer should read the text before signing. Team members should know its content too: they are told in plain words what must not be shared outside the warehouse.
Safety on site and personal belongings
For the safety of goods and people, agree the following in advance:
- personal bags and clothing stay in a designated place before entering the warehouse;
- phones and cameras are used only where the count requires it;
- the team is briefed on hazardous zones (handling equipment, high racks, chemicals);
- if there are surveillance cameras, the team is told beforehand;
- if bags are checked on exit, the procedure is the same for everyone and announced in advance.
Check the rules on camera surveillance and on people's personal data with a lawyer.
A hypothetical example
A team of eight works for two days. The list has 8 names, with 8 passes each day, so 16 entry and 16 exit records in all. On day two one team member falls ill and a replacement is sent. Because the list was not updated in advance, the newcomer is not admitted until it is corrected. The rule stops an unexpected person from ending up in the warehouse. The figures are invented.
At the end of the day
Each evening check that passes are returned, count the sheets and scanners handed in, and find out where copies of data remain. If the team was given access to the records system (1C) or to files, keep it read-only and temporary, and close it when the job ends. Agree in advance too whether lists and printed sheets left with the team are returned or destroyed.
Conclusion
A clear access procedure protects the goods, the data and the team itself. Inventory signs a non-disclosure agreement (NDA) with every client and agrees the site-entry procedure in advance, before work starts.